Hip-to-Gable Attic Conversions

A hip-to-gable attic conversion costs €35,000 to €55,000 (or more when paired with a full rear dormer).

Why 1950s–1990s hipped-roof semis cannot fit a compliant staircase without building up the side hip.

Free, no obligation. One attic conversion company covering your county prices it, not five.

  • €35,000–€55,000+typical hip-to-gable cost
  • 1.9 mmin stairs headroom at centre (TGD K)
  • 6 to 10 wkstypical build time on site
  • Planningnormally required for side profile change

How a hip-to-gable conversion solves the stairs problem

Look at your roof from the street. If the side wall of your semi-detached house or bungalow finishes in a triangular brick or block peak right up to the ridge, you have a gable roof — and a standard Velux conversion is straightforward. If instead the side of the roof slopes inwards towards the chimney, you have a hipped roof.

In a hipped roof, nearly a third of the roof volume is lost to the side slope, and the lowest part of that slope sits right over the first-floor landing where your new attic staircase needs to arrive. Under Technical Guidance Document K (Stairways), a loft staircase must have at least 1.9 metres of clear headroom at the centre of the stair width (and 1.8 m at the side). A hip-to-gable conversion builds the side wall vertically up to ridge height and extends the ridge beam across, giving you both a legal staircase landing and a full-width bedroom.

  • Masonry blockwork gable: The side wall is built up in blockwork and rendered or dashed to match the house below.
  • Timber-frame & slate/tile-hung gable: Faster to weatherproof and lighter on the existing side wall foundation.

Attic conversion cost & 2026 planning checker

Compare storage, habitable Velux, rear dormer and hip-to-gable prices, and check how the 27 July 2026 Class 1B and Class 1C exemptions apply.

1. Pick the conversion type
2. Bathroom in the attic?
3. Existing roof structure

€35,000 to €55,000

Planning: Full planning permission normally required · Full Building Regs

Hip-to-gable conversion €35,000 to €55,000 (incl. 13.5% VAT guide). Extending a sloping side hip into a vertical gable changes the side profile of the roof and normally requires full planning permission from your county council (8–12 weeks), plus structural engineering and an Opinion on Compliance for conveyancing.

Send this spec for a written quote

Real examples and installation detail

Timber roof rafters and structural carpentry during an Irish attic conversion
Structural Steel & Rafters. Structural steel and rafter build: RSJ beams (+€3,000 to €5,500 on trussed roofs), independent floor joists and 50 mm ventilated rafter insulation.
Bright habitable bedroom window meeting TGD Part B fire escape rules
Part B Fire Escape Spec. Part B fire escape and glazing: minimum 0.33 m² clear opening (450x450 mm) and 600–1,100 mm sill height for bedroom certification.

Get a fixed attic conversion price with no obligation

Tap the kind of conversion, your house type and your county. Your request goes to one attic conversion company that covers your county, and they ring you to arrange a free loft survey and written quote.

What kind of attic conversion?

Pick the closest match.

Questions people ask

Why do hipped-roof semi-detached houses need a hip-to-gable conversion?

On a hipped-roof semi-detached house, the roof slopes inwards on three sides (front, back and side). Because the existing staircase almost always runs up the side wall, the sloping side hip sits directly over the top of the landing — leaving far less than the 1.9 m minimum headroom required by TGD K for a new attic stairs. Building the side wall straight up into a gable removes that slope and creates full headroom over the stairs.

Does a hip-to-gable conversion need planning permission in Ireland?

Yes, in almost all cases. While S.I. No. 344 of 2026 exempted side and rear dormers up to 30 m³ (Class 1B), extending the side wall up into a vertical gable and extending the main ridge across changes the side elevation and roofline, which normally requires full planning permission from your local council.

How long does a hip-to-gable attic conversion take?

Expect 6 to 10 weeks on site once planning permission is granted, including scaffolding, blockwork or structural timber-frame gable construction, slating/tiling to match the existing roof, internal steelwork, staircase, fire doors and plastering.

Attic Conversion Cost across all 26 counties

Requests from all 26 counties go to one local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →

Get a fixed written quote for your attic conversion

One specialist covering your county checks your ridge height, roof structure and stairs landing, and gives you a written price.